MONTH |
DELIVERABLE |
ENTITIES: Lead (Particip.) |
---|
Μ3 |
D01 Existing Technologies and Trends to Save irrigation water: Mapping & benchmarking of existing irrigation systems and methodologies to save irrigation water. The study will include both theoretical models as well as implementation technologies with experimental / pilot results, from application to areas / cultivations with similar characteristics (climatic and hydrological). |
AUA(TEIPel, ITCS) |
M6 |
D02 System User Requirements: The users requirements (producers and organizations) of the proposed system (collection of questionnaires / interviews with all potential stakeholders) with the techno-economic parameters, form the high-level requirements of the system, which will lead the design and development. |
TEIPel(ALL) |
Μ6 |
D03 Feasibility Study ‒ Techno-economic Analysis: Based on the requirements of system users, the feasibility study evaluates its potential (SWOT analysis, market study) and sets out techno-economic criteria / parameters for its success. |
ITCS |
Μ124 |
D04 Soil Measurement Subsystem Design: Design of ground equipment (selection of sensors and supports), methodology and timeline of measurements for the calibration of supported crops, computational models and CWSI calculation parameters. |
AUA(CITE) |
Μ24 |
D05 Unmanned Aircraft Subsystem Design: Design of aerial recording equipment (UAS platform selection, thermal / optical camera, IR sensor), flight methodology and timelines, methods of recording and communicating metering data, control of specific flight parameters for IR sensor measurements. |
ALTUS(CITE, AUA) |
Μ24 |
D06 Architecture & Subsystem Networking Protocols: System architecture (functional and physical), data flows and interfaces, measurement data communication protocols, control data and subsystem networking. |
TEIPel(CITE, ALTUS, AUA) |
Μ24 |
D07 Irrigation Management Application Design: Irrigation Management Application Design (Use cases, flow charts, CWSI algorithms & irrigation behavior models, Databases, Storage & Management of data & metadata, I / Fs graphics, subsystem communication) |
CITE(ALTUS, TEIPel, AUA) |
Μ24 |
D08 Aerial surveillance Application Design: Air Surveillance Application Design (Use cases, flow charts, visual / thermographic imaging models, Databases, Storage & Management of data & metadata, I / Fs graphics, subsystem communication) |
CITE(ALTUS, TEIPel, AUA) |
Μ24 |
D09 Prototype Ground Measurement Subsystem: Supply of ground measurement subsystem for each experimental site (support masts, data loggers, IR radiometer, Net radiometer, Pyranometer, Anemometer, Temperature / Humidity probes, Communication module, Soil water Reflectometers) |
AUA (CITE, ALTUS) |
Μ24 |
D10 Prototype Unmanned Aircraft Subsystem: Supply of unmanned aircraft recording subsystem (2 aerial platforms - quadcopter, multispectral cameras, IR sensors, telemetry radio link / IR data / image data modules, ground station). |
ALTUS |
Μ24 |
D11 Development of Irrigation Management Application: Irrigation Management Application Development (Databases, Application Logic, I / Fs graphics, subsystem sommunication). |
CITE(ALTUS, TEIPel, AUA) |
Μ24 |
D12 Development of Aerial surveillance Application: Development of Air Surveillance Application (Databases, Application Logic, I / Fs graphics, communication with subsystems). |
CITE(ALTUS, TEIPel, AUA) |
Μ26 |
D13 Installation of Ground Measurement Subsystem: Installation of ground measurement equipment in 3 experimental sites, operation control, configuration, subsystem and applications communication tests. |
AUA(ALTUS, CITE, TEIPel, Producers) |
Μ26 |
D14 Installation of Unmanned Aircraft Subsystem: Installation of air metering equipment in 3 experimental sites, operation control, configuration, subsystem and applications communication tests. |
ALTUS(CITE, AUA, TEIPel) |
Μ26 |
D15 Pilot Configuration of Irrigation and Surveillance Applications: Configuration and Operational Control of Irrigation and Air Surveillance Management Applications (Databases, Application Logic, I / Fs graphics, subsystem communication) with the data from the 3 experimental sites. |
CITE(ALTUS, TEIPel, AUA) |
Μ20 |
D16 Pilot Operation, testing of Usage Scenarios and Data Collection: System operation and systematic data logging, usage scenario testing and configuration of equipment & applications during a full (summer) growing season. |
ALTUS(CITE, AUA, TEIPel, Producers) |
Μ27 |
D17 Processing and Evaluation of Pilot Operation Results: Pilot data and events are recorded, processed and evaluated quantitatively & qualitatively for the verification of objectives and completion of system functionality. |
AUA(ALTUS, CITE, TEIPel, Producers) |
Μ31 |
D18 Business Models and Utilization Results Plans: Techno-economic evaluation of the results of the pilot operation following the Feasibility Study analysis, utilization scenarios and related business models, which mainly involve businesses and producers, but also Organizations that are strategically interested in implementing water policies, such as the Peloponnese Region. |
ITCS(ALL) |
Μ33 |
D19 Installation Manuals, for Configuration and System Usage: Installation and configuration manuals addressed to the system installation and operation technician and usage manuals for system applications users. |
CITE(ALTUS, AUA, TEIPel, Producers) |
Μ36 |
D20 Project Website and system services: The site is used to disseminate project-related information (throughout the project) and to access system services during the pilot phase. |
CITE(ICTS, TEIPel, ALTUS) |
Μ36 |
D21 Scientific Publications in magazines and conferences: Scientific publications related to the subject of the project (precision agriculture, CWSI implementation for irrigation water management, geospatial data management, etc.). At least 3 publications planned in the context of the project. |
AUA(TEIPel, CITE, ALTUS, ITCS) |
Μ36 |
D22 Presentation of project's results Workshop: Project Dissemination Workshop in Messinia: preparation, secretarial support, speaker organization. |
CITE(AUA, ICTS, TEIPel, ALTUS) |
Μ36 |
D23 Essay of Chartered Accountant - Auditor: For Entities that are businesses, because Higher Education Institutions SARG' s have their own expenditure control and certification procedures. |
CITE(ALTUS) |
Μ36 |
D24 Report and evidence of participation in international trade fair: Participation of companies involved in the project and in the business exploitation of its results, in an international trade fair. |
CITE(ALTUS, ITCS) |